July
11: Pepe and Al Honig adding mesh to the mouth. Pepe had to
redo this section after a speeding car smashed into it in
the middle of the night.
Note
the wicked-looking hook, by which the poor creature will be
pulled.
|
 |
|
Pepe
works on the tail while Arjuna adds a carriage lamp. Note
the newly mullioned windows.
A
lot of the mesh work here is being done by Derrell and Tiff.
|
 |
| July
18: Elegant staining. Plexiglass portholes added by Christof.
Dramatic progress on fish scales. |
 |
| July
27:Smoothing
plaster on fish scales.
Masts
awaiting attachment.
|
 |
|
Pepe
by fish mouth, with temporarily attached nose.
|
 |
|
August
3. Pepe and Melitta putting the final plaster touches on the
mouth.
Saturday
was dedicated to finishing plastering the scales.
|
 |
|
Robert put in many hours, as did Alison, Christof, Dan, Ronna
and Jim. |
 |
| Looking
down from the masts, stern and bow. |
 |
|
Alison
at work on sternside scales.
Getting
the underside to stick was particularly awkward.
|
 |
|
A
peek inside the Captain's Cabin.
|
 |
| The
Ark broadside. The middle section of scales, applied by Derrell
and Tiff midweek, has been temporariloy removed.
|
|